TECON Heavy Duty Steel Prop est les accessoires en acier les plus robustes et les plus compatibles avec une capacité portante élevée. Il est conforme aux normes EN1065 en deux séries, TEP-D et TEP-E. Ils ont l'avantage supplémentaire d'exiger moins en raison de leur capacité de charge élevée.
Robust and long service life
High bearing capacity following EN 1065 standard
Cast steel nut
Safe zone prevent hand from harzad Electro galvanization, powder coated and hot-dip galvanization finishing for option
Shoring heights: 2.5/3.0/3.5/4.0/4.5/5.0/5.5 m
1.7 times safety factor within work load
The work load of TEP-D is 20 kN
The work load of TEP-E is 30 kN
Outer Dimension: 76.1/ 63.5 mm
High tensile steel tube Q355
Heavy Duty Prop-D
Description | Unit | QTY | Unit Price USD | Total Price USD | Unit Weight (KG) | Total Weight (KG) | Remarks |
Heavy Duty Prop TEP-D 25 | pcs | 0 | 0 | 0 | 15.9 | 0 | Powder Coated; S355 Inner tube; Refer to EN1065 norms: |
Heavy Duty Prop TEP-D 30 | pcs | 0 | 0 | 0 | 18 | 0 | Powder Coated; S355 Inner tube; Refer to EN1065 norms: |
Heavy Duty Prop TEP-D 35 | pcs | 0 | 0 | 0 | 20.22 | 0 | Powder Coated; S355 Inner tube; Refer to EN1065 norms: |
Heavy Duty Prop TEP-D 40 | pcs | 0 | 0 | 0 | 23.43 | 0 | Powder Coated; S355 Inner tube; Refer to EN1065 norms: |
Heavy Duty Prop TEP-D 45 | pcs | 0 | 0 | 0 | 27.66 | 0 | Powder Coated; S355 Inner tube; Refer to EN1065 norms: |
Heavy Duty Prop TEP-D 50 | pcs | 0 | 0 | 0 | 33.06 | 0 | Powder Coated; S355 Inner tube; Refer to EN1065 norms: |
Heavy Duty Prop TEP-D 55 | pcs | 0 | 0 | 0 | 38.7 | 0 | Powder Coated; S355 Inner tube; Refer to EN1065 norms: |
Description | Unit | QTY | Unit Price USD | Total Price USD | Unit Weight (KG) | Total Weight (KG) | Remarks |
Heavy Duty Prop TEP-E 25 | pcs | 0 | 0 | 0 | 17.14 | 0 | Powder Coated; S355 Inner tube; Refer to EN1065 norms: |
Heavy Duty Prop TEP-E 30 | pcs | 0 | 0 | 0 | 19.35 | 0 | Powder Coated; S355 Inner tube; Refer to EN1065 norms: |
Heavy Duty Prop TEP-E 35 | pcs | 0 | 0 | 0 | 21.97 | 0 | Powder Coated; S355 Inner tube; Refer to EN1065 norms: |
Heavy Duty Prop TEP-E 40 | pcs | 0 | 0 | 0 | 29.76 | 0 | Powder Coated; S355 Inner tube; Refer to EN1065 norms: |
Heavy Duty Prop TEP-E 45 | pcs | 0 | 0 | 0 | 32.35 | 0 | Powder Coated; S355 Inner tube; Refer to EN1065 norms: |
Applied as shoring support in various slab formwork system with high standard
Vous pouvez nous envoyer votre liste de matériel pour demander un devis, ou vous pouvez également nous envoyer simplement le dessin structurel et les informations de projet pour le coffrage complet et la proposition d'échafaudage via les contacts ci-dessous.
Courriel: info@teconform.com
Téléphone: 86-512-65650586
Mobile: 86-13862020161.
Par T/T ou L/C.
Pour le coffrage d'escalade, la plate-forme auto-grimpante, le coffrage en plastique, nous avons du stock dans notre entrepôt. La préparation du chargement sera dans les 10 à 15 jours.
Pour la poutre en bois H20, la fermeture TECON-Form, le délai est de 15 à 25 jours.
Pour les autres systèmes, le délai est de 30 à 45 jours.
Pour un délai plus précis, n'hésitez pas à nous contacter pour un produit spécifique basé sur votre quantité.